PROFILE
  • Formed as a separate company in the year 2004

     
  • Was merged with Ramsarup Industries Limited in the year 2008

     
  • The unit has been put up to complete the integration mission of Ramsarup i.e. from iron ore mines to transmission lines

     
  • Will feed the wire units and TMT unit of Ramsarup Industries Limited

     
  • Total land area – 325 acres

     
  • Following facilities have been put/ under installation

 

 

 
 

 

Facility

TMT Technology/ Equipment Suppliers

Status of Project
350m3 Blast Furnace to produce approx. 0.3 Million MT of Hot Metal per annum Mecon technology with Bell less top from China Commenced production in the year 2007
500TPD DRI Plant to produce approx. 0.15 Million MT of DRI per annum Outokumppu technology, Germany with Kiln from Tata Growth Shop Commenced production in the year 2009
20MW Captive Power Plant IJT Cethar Vessels and Hangzhou, China Commenced generation in the year 2009
4600m3 Air Separation Plant SASPG, China Will commence during FY 2009/10
Steel Melting Shop comprising of 70MT EAF/ Ladle refining and Caster to produce 0.70 Million MT of Billets in sizes 130mm2 to 200mm2 Furnace from M/s. Sarralle, Spain
and Caster from Siemens VAI, Austria
Will commence during FY 2009/10
90m2 Sinter Plant of capacity 0.90 Million MT per annum China Shougang, China Will commence during FY 2009/10